Production Planning - SAP HANA


PP Module covers –
·         Applicable Master data
o   Material Master (Comes under the MM module) MM01,MM02,MM03
o   BOM (TCodes – CS01, CS02, CS03)
o   Routing (TCodes – CA01, CA02, CA03)
o   Versions (TCode - C223)
o   Work Center (TCodes – CR01, CR02, CR03)
§  Scheduling
§  Capacity
§  Costing
·         Planning              
o   Demand Management (Make to Stock/Make to Order)
o   Material Requirement Planning (MRP Run)
o   Production Orders
o   Production Order Confirmation
o   Production Order Close
·         Repetitive Manufacturing (REM Confirmation (TCode – MFBF)
o   Make to Order (Manufacturing for Customer orders)
o   Make to Stock (Repetitive manufacturing)

Repetitive Manufacturing
  1. ·         Requesting of materials from the Stores to the Production floor (Item reservation – TCode - MB21)
  2. ·         Transfer posting (to bring raw materials to the production floor) (TCode – MIGO)
  3. ·         REM Confirmation (Manufacturing data is entered to the system) (TCode – MFBF)
  4. ·         Quality inspection (Quality check to either Accept/Reject the finished goods) (TCode – QA32)
  5. ·         Transfer posting (to take the finished goods from the production floor to the finished goods store) (TCode – MIGO)



In the REM Confirmation , when you  record the production, you could direct them to a default storage location. This location is defined in the Material master data – Work Scheduling – Production Storage Location
To view the GL entries – Go to TCode MIGO – Display Document information – Provide the Document number which was generated in the REM Confirmation
To view an already recorded REM Confirmation – Tcode – MF12